Service capability:
R&D, overall design, and EPC of full containment prestressed concrete LNG storage tanks with volumes ranging from 30,000 m3 to 270,000 m3;
Standard design system for LNG storage tanks;
Digital collaborative design based on SPF (SmartPlant Foundation, an intelligent information integration platform);
Treatment of the foundations of LNG storage tanks and structural optimization of LNG storage tanks under multiple geologic conditions in coastal areas and along inland waterways;
Vibration mitigation and isolation, cryogenic insulation, and the use of locally manufactured products for super large LNG storage tanks;
World-leading automatic welding technique for welding the inner shells (containers) of LNG storage tanks.
Industrial qualifications:
Class A design qualification for the oil and natural gas (offshore oil) industry;
Grade III qualification for main contractors of petrochemical projects;
Class C qualification for professional consultants in the oil and natural gas industry.
Projects:
1、Tianjin LNG Storage Tank EPC Project
Location: Tianjin, China
Duration: January 2013-November 2014
Scope of work: engineering, procurement, construction and commissioning (EPCC) of two 30,000 m3 full containment concrete cryogenic LNG storage tanks and related technical services.
Owner: CNOOC Tianjin Liquefied Natural Gas Co., Ltd
2、Guangxi LNG Storage Tank EPC Project
Location: Guangxi, China
Duration: April 2014-October 2015
Scope of work: engineering, procurement, construction and commissioning (EPCC) of two 30,000 m3 full containment concrete cryogenic LNG storage tanks and related technical services
Owner: CNOOC Guangxi Fangchenggang Natural Gas Co., Ltd
3、Tianjin 160,000 m3 LNG Storage Tank EPC Project
Location: Tianjin, China
Duration: May 2016-October 2018
Scope of work: engineering, procurement, construction, installation, inspection, test and startup of a 160,000 m3 full containment prestressed concrete cryogenic LNG storage tank and related technical services
Owner: CNOOC Tianjin Liquefied Natural Gas Co., Ltd
LNG Terminals
Service capability:
Whole-process consulting and overall planning and design of large LNG terminals with capacity measured at 10,000,000 tons;
Execution of large LNG terminal projects measured at 10,000,000 tons;
EPC of large LNG terminals with capacity greater than 10,000,000 tons per annum.
Industrial qualifications:
Class A design qualification for the oil and natural gas (offshore oil) industry;
Grade III qualification for main contractors of petrochemical projects;
Class C qualification for professional consultants in the oil and natural gas industry.
Projects:
1、Zhejiang LNG Terminal Phase II Project
Location: Zhejiang, China
Duration: June 2018-December 2020
Scope of work: engineering, procurement, construction, commissioning and startup of three 160,000 m3 LNG storage tanks, and the expansion of the auxiliary facilities of the LNG terminal with a capacity of 3.00 million tons per annum (MTPA).
Owner: CNOOC Zhejiang Ningbo Liquefied Natural Gas Co., Ltd
2、Zhangzhou LNG Terminal Project
Location: Fujian, China
Duration: July 2018-October 2022
Scope of work: engineering, procurement, construction, commissioning and startup of two 160,000 m3 LNG storage tanks, and the construction of the LNG terminal with a capacity of 3.00 MTPA.
Owner: PipeChina Fujian Investment Natural Gas Co., Ltd
3、Tangshan LNG Terminal Project
Location: Hebei, China
Duration: May 2019-August 2024
Scope of work: engineering, procurement, construction, commissioning and startup of eight 200,000 m3 LNG storage tanks and auxiliary facilities, and the construction of the LNG terminal with a capacity of 17.00 MTPA, office buildings in the plant area, etc.
Owner: Caofeidian Xintian LNG Co., Ltd
4、Tianjin LNG Terminal Phase II Project
Location: Tianjin, China
Duration: April 2020-August 2023
Scope of work: engineering, procurement, construction, commissioning and startup of six 220,000 m3 LNG storage tanks and auxiliary facilities, and the expansion of the auxiliary facilities of the LNG terminal with a capacity of 10.00 MTPA.
Owner: PipeChina Tianjin LNG Co., Ltd
5、Longkou LNG Terminal Project
Location: Shandong, China
Duration: April 2020-September 2023
Scope of work: engineering, procurement, construction, commissioning and startup of six 220,000 m3 LNG storage tanks and auxiliary facilities, and the construction of the LNG terminal with a capacity of 10.00 MTPA.
Owner: PipeChina Nanshan (Shandong) Natural Gas Co., Ltd
6、Zhuhai LNG Terminal Phase II Project
Location: Guangdong, China
Duration: June 2021-December 2023 (estimated)
Scope of work: engineering, procurement, construction, commissioning and startup of five 270,000 m3 LNG storage tanks and additional auxiliary facilities and other related services, and the expansion of the auxiliary facilities of the LNG terminal with a capacity of 7.00 MTPA.
Owner: Guangdong Zhuhai Golden Bay LNG Co., Ltd
Service capability:
Systematic overall planning and design of liquefaction plants;
Engineering applications based on proven liquefaction processes in the industry;
Execution of EPC projects related to the digital design and modular construction of liquefaction plants.
Industrial qualifications:
Class A design qualification for the oil and natural gas (offshore oil) industry;
Grade III qualification for main contractors of petrochemical projects;
Class C qualification for professional consultants in the oil and natural gas industry.
Projects:
1、Xi’an LNG peak shaving facilities EPCM project
Location: Shaanxi, China
Duration: April 2018-December 2023 (estimated)
Scope of work: preliminary design review, part of detailed design, and whole-process project management services for a natural gas liquefaction plant with a processing capacity of 3000,000 m3/d, two LNG regasification units with a processing capacity of 6000,000 m3/d, two 50,000 m3 full containment LNG storage tanks, one 160,000 m3 full containment LNG storage tank, and auxiliary facilities
Owner: Shaanxi Liquefied Natural Gas Reserves & Logistics Co., Ltd