Services

Projects

Construction

    LNG Modules

Construction sites:

    Qingdao Yard, yard area: 1,200,000 m2

    Tanggu Yard, Tianjin, yard area: 200,000 m2

    Tianjin Intelligent Manufacturing Base, yard area: 5,750,000 m2

    Zhuhai Yard, yard area: 20,720,000 m2

Capacity:fabrication of 270,000 tons of steel structures per year, onshore construction of 50,000 tons of single units, onshore transportation of 15,000 tons of large single structures.

Main facilities: segment prefabrication workshop, structure fabrication workshop, pipe fabrication workshop, module construction workshop, painting workshop, floating unit platform (420 m×110 m×13.9 m), five slideways with a load bearing capacity of 4,000-50,000 T.

Equipment: one 800 T gantry crane, one 600 T gantry crane (Qingdao), one 900 T gantry crane (Tianjin), 120 5-150 T overhead cranes in workshops (Zhuhai), 36 70-750 T crawler cranes (24 in Qingdao and 12 in Zhuhai), two 250 T flatcars (Zhuhai), 324-axis SPMTs with a total capacity of 15,000 T, 108-axis SPMTs.

Projects:

1.Canada LNG Project

Location: British Columbia, Canada

Time: 2020-2022

Scope of work: construction of 35 modules (including 19 core process modules and 16 pipe gallery modules) with a total weight of about 1,780,000 tons.

Project owner: LNGC-Shell


2.YAMAL LNG Project

Location: Yamal Peninsula, Russia

Time: 2014-2017

Scope of work: 36 core process modules with a total weight of about 180,000 tons.

Project owner: YAMGAZ (a joint venture formed by TECHNIP, JGC and CHIYODA)


Floating Units

Construction site:

    Qingdao Yard, yard area: 1,200,000 m2

     wharf shoreline: 1645 m, wharf water depth: 10-12 m

Capacity:   fabrication of 270,000 tons of steel structures per year, onshore construction of 50,000 tons of single units, construction of 300,000 tons of single floating units, onshore transportation of 15,000 tons of large single structures.

Main facilities:  segment prefabrication workshop, structure fabrication workshop, pipe fabrication workshop, module construction workshop, painting workshop, floating unit platform (420 m×110 m×13.9 m), five slideways with a load bearing capacity of 4,000-50,000 T.

Equipment:   one 800 T gantry crane, one 600 T gantry crane, 24 70-750 T crawler cranes, 324-axis SPMTs with a total capacity of 15,000 T.

Projects:

1.Penguins FPSO Project

Location: North Sea, UK

Time: 2018-2022

Scope of work: shop design of hull and topside with a total weight of about 30,000 tons, procurement of some materials, construction, assembly, mechanical completion, pre-commissioning and commissioning support for hull/topside/living quarters.

Project owner: Shell


2.Liuhua 16-2 Project

Location: South China Sea

Time: 2018-2020

Scope of work: construction, assembly, shop design of hull, topside and single point mooring system, procurement of some materials, mechanical completion, pre-commissioning/commissioning support.

Project owner: CNOOC China Limited


3.Lingshui 17-2 Project

Location: South China Sea

Time: 2018-2020

Scope of work: construction of hull, modules, living quarters, integration, shop design, procurement of some materials, mechanical completion, pre-commissioning/commissioning support.

Project owner: CNOOC China Limited


4.Jack-up drilling rig projects

Location: Bohai Bay and other similar sea areas in China

Time: 2008-2011

Scope of work: construction of 3-legs, jack-up and cantilever offshore drilling platforms.

Project owner: China Oilfield Services Limited


5.Liuhua 11-1/4-1 Project

Location: South China Sea

Time: 2022-2024

Scope of work: shop design, procurement of some materials, hull/topside/living quarters construction, assembly, mechanical completion, pre-commissioning/commissioning support.

Project owner: CNOOC China Limited


6.Petrobras P67/P70 FPSO Project

Location: Santos Pre-salt Oilfield, Brazil

Time: 2015-2019

Scope of work: completion of the remaining works of FPSO units P67/P70, lifting and assembly of modules, mechanical completion, commissioning support, construction of the topside of FPSO unit P70.

Project owner: Tupi BV (Petrobras NL 65%, Shell 25%, Galf 10%)


Conventional Platforms and Jackets with Pile Foundations

Construction site:

     Qingdao Yard, yard area: 1,200,000 m2

Capacity: fabrication of 270,000 tons of steel structures per year, onshore construction of 50,000 tons of single units, onshore transportation of 15,000 tons of large single structures.

Main facilities: segment prefabrication workshop, structure fabrication workshop, pipe fabrication workshop, module construction workshop, painting workshop, floating unit platform (420 m×110 m×13.9 m), five slideways with a load bearing capacity of 4,000-50,000 T.

Equipment: one 800 T gantry crane, one 600 T gantry crane, 24 70-750 T crawler cranes, 324-axis SPMTs with a total capacity of 15,000 T.

Projects:

1.Liwan 3-1 Project

Location: South China Sea

Time: 2010-2013

Scope of work: construction of one 32,000 T module (including living quarters) and one 32,000 T deepwater jacket, shop design, procurement of some materials, mechanical completion, pre-commissioning/commissioning support.

Project owner: CNOOC China Limited


2.Bohai Sea Oilfield Cluster Shore Power Application Project

Location: Bohai Sea, China

Time: 2020-2021

Scope of work: construction of two EPP modules and four jackets, shop design, procurement of some materials, mechanical completion, pre-commissioning/commissioning support.

Project owner: CNOOC China Limited


3.ZAWTIKA 1B EPCIC Project

Location: Gulf of Martaban, Myanmar

Time: 2014-2016

Scope of work: construction of four platforms, shop design, procurement of some materials, mechanical completion, pre-commissioning/commissioning support.

Project owner: PTTEP


4.Indonesia SES Project

Location: JAVA, Indonesia

Time: 2005-2007

Scope of work: construction of three platforms, shop design, procurement of some materials, mechanical completion, pre-commissioning/commissioning support.

Project owner: CNOOC & Indonesia


Construction site:

              Zhuhai Yard, yard area: 20,720,000 m2

Capacity: Zhuhai Yard is mainly engaged in the construction of deepwater floating structures and related products and focused on the construction and final assembly of semi-submersible drilling platforms, cylindrical floating platforms, TLPs, SPAR platforms, semi-submersible drilling vessels, large integrated modules, and topsides of FLNG/FPSO units, the installation and testing of subsea manifolds, Christmas trees, control modules and jumpers, and the connection/extension of flexible pipelines and subsea pipelines.

Main facilities: slideway 1# (350,000 T), slideway 3# (120,000 T), quay 1#, quay 5#, cutting workshop, structure fabrication workshop, painting workshop, repair workshop.

Equipment: 120 5-150 T overhead cranes in workshops, 12 150-750 T crawler cranes, 108-axis SPMTs, one 380 T transport trailer, two 250 T flatcars.

Projects:

1.Canada LNGC Project

Location: British Columbia, Canada

Time: 2019-2022

Scope of work: construction of 157 modules with a total weight of about 108, 014 tons.

Project owner (full name): EPCI contractor: JFJV (a joint venture formed by JGC and Flour); owner: LNGC-Shell


2.KIPIC Project

Location: Australia

Time: 2017-2019

Scope of work: 188 modules with a total weight of about 83,000 tons.

Project owner (full name): FDHGV (Fluor joint venture)


3.Lufeng 14-4/15-1 Modules and Living Quarters Project

Location: South China Sea

Time: 2020-2022

Scope of work: modules and living quarters with a total weight of about 23,186 tons.

Project owner (full name): CNOOC China Limited


4.Thailand Jackets Project

Location: Thailand

Time: 2015-2015

Scope of work: jackets with a total weight of about 7,300 tons.

Project owner: PTT Public Company Limited


5.Lufeng 15-1 Jacket Project (Haiji-1)

Location: South China Sea

Time: 2020-2022

Scope of work: jackets with a total weight of about 30,040 tons.

Project owner: CNOOC China Limited


6. Hong Kong LNG Terminal Project

Location: Zhang Island, South China Sea

Time: 2021-2022

Scope of work: six modules, six jetties, and one central module with a total weight of about 4,000 tons.

Project owner: Hong Kong government


Construction site:

    Tanggu Yard, Tianjin, yard area: 200,000 m2

Capacity: fabrication of 60,000 tons of steel structures per year, four slideways with a maximum single-leg bearing capacity of 1,300 tons

Main facilities:  pipe fabrication workshop, piping workshop, painting workshop, piping, electrical and instrument manufacturing center, warehouse and storage areas.

Projects:

1.ZAWTIKA 1B EPCIC Project

Location: Gulf of Martaban, Myanmar

Time: 2014-2016

Scope of work: design, construction and offshore installation of four wellhead platforms, the laying of four submarine pipelines. Worksite: about 300 km south of Yangon, Myanmar; average water depth: 150 m.

Project owner: PTTEP


2.LLSW WELLPAD Project

Location: Alberta, Canada, near the existing Long Lake oil sands facility, about 50 km south of Fort McMurray.

Time: September 3, 2018-March 15, 2019 (9116)

Scope of work: procurement of some materials, shop design (including the connections of structures, modeling of ancillary structures), construction, inspection, pre-commissioning, loading support.

Project owner: Nexen


3.Bozhong 19-6 Project

Location: Bohai Sea, China

Time: February 2019-October 2020

Scope of work: construction of a new four-leg jacket platform (wellhead platform) with 12 well slots, with 6 slots on each of the southern and northern sides of the platform arranged in a 3 (columns) ×2 (rows) pattern, and a 10-person living building, the laying of a 13.6 km long single-layer, uninsulated submarine gas transmission pipeline from BZ19-6 WHPA platform to BZ13-1 BOP platform with anchor blocks, the laying of 35 kV, 3C*70 mm² composite submarine cable leading from the new 35 kV switchgear on Bozhong 13-1 BOP platform, and the laying of a new 6.6 km long double-layer insulated submarine mixed transmission pipeline from BZ19-6 WHPA platform to BZ19-4 WHPB platform.

Project owner: CNOOC China Limited Tianjin Branch


4.Dongfang 13-2 Gas Fields Development Project

Location: South China Sea

Time: 2017-2018

Scope of work: onshore and offshore commissioning of DF13-2WHPA module/DF13-2CEPB module (including living quarters), weighing of the modules, calibration of instruments; the laying and welding of four submarine pipelines, namely, a 24-inch single-layer carbon steel pipeline from DF13-2CEPB to YC13-1AWA with a total length of about 195 km and concrete blocks, a 6-inch single-layer carbon steel pipeline from DF13-2CEPB to DF1-1PRP with a total length of about 21.5 km with concrete blocks, a 18-inch single-layer composite pipeline from DF13-2CEPB to DF13-2WHPA with a length of about 5.9 km with concrete blocks, and a 18-inch single-layer carbon steel pipeline from the three-way connection to LD22-1CEP with a length of about 1.4 km with concrete blocks, as well as related corrosion protection and welding procedure qualification.

Project owner: CNOOC


5.Hengyi (Brunei) Single Point Mooring (SPM) and Submarine Pipeline Systems EPC Project

Location: Brunei

Time: 2017-2018

Scope of work: preparation of welding procedure specifications and procedure qualification records, related tests, construction and support for the offshore operation of single-point mooring system and subsea manifolds/base plates, management of the laying of onshore and submarine pipelines, including welding, inspection, corrosion protection, and other related works.

Project owner: CNOOC


6.Penglai 19-3 Oilfield Areas 1/3/8/9 Comprehensive Adjustment Project

Location: Bohai Sea, China

Time: 2016-2017

Scope of work: shop design and onshore construction of the WHPV/WHPG modules, living quarters, and CEPB module LMU, and support for the loadout, sea fastening and offshore installation of the WHPV/WHPG modules, living quarters, and CEPB module LMU; onshore/offshore commissioning of the WHPV/WHPG modules, CEPB module and jetty, as well as calibration of instruments; weighing of WHPV/WHPG modules and living quarters, modification of slide shoes; support for the laying of submarine pipelines; procurement of some materials, etc.

Project owner: CNOOC


Construction site:

     Tianjin Intelligent Manufacturing Base, area: 5,750,000 m2

Capacity: fabrication of 87,000 tons of steel structures per year, annual steel cutting and fabrication capacity: 38,000 tons, four integrated work bays with a maximum single-leg bearing capacity of 1,400 tons.

Main facilities:steel structure intelligent manufacturing center, shot blasting workshop, painting workshop, piping&electrical&mechnical&instrument manufacturing center, intelligent storage center, high-efficiency pipe manufacturing center (Phase II), pre-outfitting yard, general assembly yard, SPMTs.Equipment: one 900 T gantry crane, one SPMT, eight 70-750 T crawler cranes.

Projects:

1.Bozhong 29-6 Oilfield Development Project

Location: Bohai Sea, China

Time: 2021-2022

Scope of work: construction of the WHPA module (including living quarters) and WHPB module, procurement of some materials, process technology, commissioning support, sea fastening and offshore operations, welding of four submarine pipelines with a total length of 35 km and other related works.

Project owner: CNOOC


2.Kenli 6-1 Oilfield Development Project

Location: Bohai Sea, China

Time: 2021-2022

Scope of work: shop design, partial procurement, and construction , support for the commissioning and loadout, sea fastening and offshore installation of of nine new-bulit wellhead modules and two jackets, joint welding of 12 submarine pipelines with a total length of 124.1 km and other related works.

Project owner: CNOOC


3.Penglai 19-3 Oilfield Areas 5/10 Development Project

Location: Bohai Sea, China

Time: 2021-2022

Scope of work: onshore construction, sea fastening and offshore installation of two new jackets; onshore construction, sea fastening, offshore connection, commissioning support, and other related works of two new platforms; pre-fabrication, and laying of two new mixed transmission pipelines and two water injection pipelines.

Project owner: CNOOC


链接链接链接链接链接链接链接链接